This page walks one small, concrete scenario through every term in the SWI formula, the same way the SCI Guidance Quick Guide walks an e2-standard-4 VM through SCI = (E×I) + M per R. All numbers below are illustrative placeholders, clearly labelled as such — they demonstrate the mechanics of the calculation, not published water-intensity factors. Do not treat any figure on this page as a real measurement.

The scenario​

A containerised API workload runs on a single virtual machine in a cloud region, handling a steady stream of requests. We want its SWI, on both a consumption and a withdrawal basis, for one month of operation.

Step 1 — Bound​

Following the spec's Bound step: the software boundary for this example is the containerised application and the virtual machine it runs on, for one calendar month. We exclude the client devices making requests and any downstream services not controlled by this workload.

Step 2 — Scale​

Following Scale: this API's costs scale with traffic, so we choose R = 1,000 API requests as the functional unit. (An illustrative example only — a real assessment would justify this choice against how the specific workload actually scales, per the Functional Unit guidance.)

Step 3 — Define​

Following Define: for this illustrative walkthrough we use modelled estimates throughout — energy from the cloud provider's usage dashboard, WUE and EWIF from published facility/regional figures (illustrative values, not sourced from a specific real facility for this example), embodied water from a time-share/resource-share allocation of the VM's underlying hardware.

Step 4 — Quantify​

Inputs (illustrative placeholders):

InputPlaceholder value
Energy consumed, E (for 20,000 requests this month)5 kWh
Facility WUE0.3 L/kWh (illustrative)
EWIF_c (consumption basis)1.8 L/kWh (illustrative)
EWIF_w (withdrawal basis)4.2 L/kWh (illustrative)
Embodied water allocated to this VM, W_M,c / W_M,w0.4 L / 0.9 L (illustrative, already time-share/resource-share allocated)

Direct operational water (consumption basis):

W_O,c^dir = E × WUE = 5 × 0.3 = 1.5 L

(No standardised withdrawal equivalent to WUE exists — see Direct Operational Water for why direct operational withdrawal is left unquantified in this example.)

Indirect operational water:

W_O,c^ind = E × EWIF_c = 5 × 1.8 = 9.0 L
W_O,w^ind = E × EWIF_w = 5 × 4.2 = 21.0 L

Totals for 20,000 requests this month:

ConsumptionWithdrawal
W_O^dir1.5 Lnot quantified (data gap)
W_O^ind9.0 L21.0 L
W_M0.4 L0.9 L
W_b10.9 L21.9 L (indirect + embodied only)

Step 5 — Report, unadjusted SWI, scaled to R = 1,000 requests:

SWI_c = 10.9 / 20 = 0.545 L per 1,000 requests
SWI_w = 21.9 / 20 = 1.095 L per 1,000 requests

A full report would also apply characterization factors (CF_c,i, CF_w,i) for the region where the electricity was generated, per Stress Characterisation, to produce SWI_c^adj and SWI_w^adj — omitted here since this walkthrough is illustrating the unadjusted mechanics only.

What this example is not​

A single-VM, single-month illustration like this is deliberately small. A more rigorous worked example — stress-testing the formula across multiple power generation units feeding a single data centre, with real characterization data — has been proposed within the SSWG and is expected to be contributed as a full page or case study once drafted. It is not fabricated here; when it lands, it will supersede this page as the primary worked example and this page will likely narrow to the introductory role the SCI Quick Guide's e2-standard-4 example plays. The Workday AI worked example in the SCI-for-AI guidance is the precedent for the depth expected of that fuller example.