Formula Walkthrough and Visual Reference

Formula Walkthrough and Visual Reference

This page walks through every formula in the SWI specification, one at a time, the same way each time: first in plain words, then as a "recipe" shape, then with a small worked number so you can see the arithmetic actually happen, and only then with the precise notation from the specification. If a formula here is unfamiliar, read it top to bottom — each one builds on the one before it.

The worked numbers throughout are a single running, hypothetical example — a service handling 100,000 requests in a month — used purely to show the arithmetic chaining together. They are illustrative placeholders, not published water-intensity factors. Do not treat any number on this page as real data.

The decomposition, as a tree​

Decomposition tree: total water W splits into operational water W_O and embodied water W_M; operational water splits further into direct and indirect; every leaf resolves to a consumption or withdrawal basis, then a characterization factor.

This recreates, in diagram form, the decomposition the SSWG worked through on its shared Miroboard during specification review; it is not a literal reproduction of that board. Each leaf is quantified twice — once as a physical volume (unadjusted) and once weighted by local water stress (stress-adjusted) — before being divided by the functional unit to produce an SWI value. The formula cards below walk down this tree from the top.

Master formula: SWI = W / R​

SWI answers one question — for every single thing your software did, how much water did that cost?

Shape: total water used ÷ how much the software did = water cost per unit of work.

Worked: a service used 500 L of water in a month and handled 100,000 requests that month → 500 ÷ 100,000 = 0.005 L per request. (illustrative)

Precise notation: SWI = W / R, where W is the total water attributable to the software system and R is the functional unit — the thing you're measuring water "per," such as an API call, a user, or an AI training run (see Functional Unit).

Splitting the total: W = W_O + W_M​

Every drop in that total came from one of two buckets: water used while the software was actually running, or water used building the hardware it runs on in the first place.

Shape: running-water bucket + hardware-making-water bucket = total water.

Worked: 500 L total = 420 L operational + 80 L embodied. (illustrative)

Precise notation: W = W_O + W_M, where W_O is operational water and W_M is embodied water.

Splitting operational water: W_O = W_O^dir + W_O^ind​

The running-water bucket itself splits two ways: water the data centre uses directly to cool itself, and water used somewhere else entirely — at the power plant — to generate the electricity the data centre is drawing.

Shape: cooling-tower water + power-plant water = operational water.

Worked: 420 L = 150 L direct + 270 L indirect. (illustrative)

Precise notation: W_O = W_O^dir + W_O^ind, split further per accounting basis as W_O,b = W_O,b^dir + W_O,b^ind (see Water Accounting Basis for what "basis" means here).

Direct operational water: W_O,c^dir = E × WUE​

Direct water scales with how much electricity your workload used, multiplied by how thirsty that particular data centre is per unit of electricity — the same shape as "miles driven × gallons per mile = gallons used," just water and electricity instead of fuel and distance.

Shape: energy used × water-per-unit-of-energy (the facility's WUE) = direct operational water.

Worked: 300 kWh × 0.5 L/kWh = 150 L. (illustrative)

Precise notation: W_O,c^dir = E × WUE, in L/kWh. This formula only covers consumption — there's currently no equivalent, widely-used formula for direct operational withdrawal, and that's a disclosed limitation of current methodology, not an oversight. See Direct Operational Water for the full picture, including that gap.

Indirect operational water: W_O,b^ind = E × EWIF_b​

Indirect water follows exactly the same shape as direct water — it's just measuring thirst at the power plant instead of the data centre.

Shape: energy used × water-per-unit-of-energy-generated (the Electricity Water Intensity Factor, or EWIF) = indirect operational water.

Worked: 300 kWh × 0.9 L/kWh = 270 L. (illustrative)

Precise notation: W_O,b^ind = E × EWIF_b. Worth saying explicitly: this is the same E as the direct-water formula above — one energy number, asked two different "how thirsty" questions. See Indirect Operational Water.

Embodied water: W_M,b = TW_b × TS × RS​

Embodied water asks: what's your fair share of the water it took to build the machine you're borrowing? You're only charged for the slice of its lifetime you actually used, and the slice of its capacity you actually used — not the water it took to build the whole thing.

Shape: total water to build the whole machine × (fraction of its life you used) × (fraction of its capacity you used) = your share. Like splitting a shared taxi fare by both how many stops you rode for and how many people were in the car.

Worked: building the server cost 4,000 L across its lifetime; you used it for 1 month out of an expected 48-month life (a time share of 1/48); you used 4 of its 32 CPUs (a resource share of 4/32); your share = 4,000 × (1/48) × (4/32) ≈ 10.4 L. (illustrative)

Precise notation: W_M,b = TW_b × TS × RS, where TS = TiR / EL and RS = RR / ToR — TiR is time reserved for the software, EL is the hardware's expected operational lifetime, RR is resources reserved for the software, and ToR is total resources available. See Embodied Water.

Splitting by accounting basis: W_c = W_O,c + W_M,c and W_w = W_O,w + W_M,w​

Do the whole add-up above twice, not once — once counting only water that left the local watershed for good (consumption), and again counting all water pulled from the ground or a river regardless of whether it came back (withdrawal). These are two different questions about two different kinds of pressure on a water system, not two ways of asking the same thing — so they're never averaged or summed together.

Precise notation: W_c = W_O,c + W_M,c and W_w = W_O,w + W_M,w; generally SWI_b = W_b / R for each basis b (c = consumption, w = withdrawal). See Water Accounting Basis for why these can never be conflated.

Stress adjustment: SWI_b^adj = Σᵢ(W_b,i × CF_b,i) / R​

This asks a second question on top of the first — not just how much water did this cost, but how much did it matter, given where it happened? A litre taken from a place with plenty of water counts for less than a litre taken from a place that's already running dry.

Shape: for each place your water use happened, multiply the water used there by that place's scarcity score; add those all up; divide by the functional unit.

Worked: 150 L direct water used in Region A (scarcity score 1.2) + 270 L indirect water generated in Region B (scarcity score 3.5) → (150 × 1.2) + (270 × 3.5) = 180 + 945 = 1,125 stress-weighted litres ÷ 100,000 requests ≈ 0.01125 L per request (stress-adjusted). Compare that directly to the unadjusted 420 ÷ 100,000 = 0.0042 L per request from the operational-only figures above — geography alone changed the answer by more than 2.5×. (illustrative)

Precise notation: SWI_b^adj = (sum over region i of W_b,i × CF_b,i) / R, where CF_b,i is the scarcity score — the characterization factor — for basis b in region i. See Stress Characterisation.

The parallel to SCI​

Readers coming from the Software Carbon Intensity (SCI) specification will recognise this shape. SWI follows the same structural pattern (ISO/IEC 21031:2024), decomposed the same way:

SCISWIRelationship
E (energy) and I (grid carbon intensity)W_O^dir and W_O^ind (operational water)Operational carbon is one multiplication (E × I); operational water is two parallel calculations — one for the facility itself, one for the electricity behind it — because water, unlike carbon intensity, has a meaningful direct component at the facility as well as an indirect one at the power plant.
M (embodied carbon)W_M (embodied water)Structurally identical: both use a time-share × resource-share allocation of a hardware total across the software sharing that hardware.
R (functional unit)R (functional unit)Identical in concept — pick the unit that matches how the software scales.
(no equivalent)CF_b,i (characterization factor)SWI's one genuinely new mechanism. Carbon dioxide's climate effect does not depend on where it's emitted; water stress is local, so SWI needs an extra step — stress adjustment — that SCI has no analogue for.

If you already know SCI, the fastest way to think about SWI is: the same E/M/R skeleton, water counted twice (consumption and withdrawal) instead of once, and a stress-weighting step bolted on because location matters for water in a way it doesn't for carbon.

The small worked numbers above exist to make each individual formula's arithmetic click — they're deliberately minimal and don't need to form one continuous scenario. For a fuller, single, start-to-finish walkthrough that chains everything together on one real-feeling scenario, following the specification's five-step Procedure, see Worked Examples.


Please submit any comments you have here.